Planning a childcare centre involves more than checking a few room dimensions. The Building Code of Australia, education and care requirements, and the permissions for a particular site address different questions. Treat them as connected parts of the project brief, rather than assuming that meeting one requirement resolves every approval.
This guide introduces the issues to discuss for a Victorian centre-based project. It is a starting point for design discussions, not a complete compliance checklist or confirmation that a property can operate as a childcare centre.
Building Code of Australia and childcare regulations
The Building Code of Australia (BCA) comprises Volumes One and Two of the National Construction Code (NCC). Victoria’s building standards guidance explains the NCC’s role in building design and construction. Ask the building surveyor which requirements and applicable edition govern the proposed work.
The Education and Care Services National Regulations form a separate operational framework under the National Quality Framework. ACECQA’s National Regulations resource identifies current instruments and jurisdictional qualifications. These regulations should not simply be relabelled as the BCA.
Separate premises design from permission to operate
The Victorian Early Childhood Regulatory Authority’s service approval guidance explains that service approval relates to the premises and cannot be granted before provider approval. Establish the relevant approval pathway alongside the site’s planning and building requirements. A design drawing or building approval should not be presented as permission to operate a service.
Identify the intended service type and age groups at the outset. Explain whether the proposal involves a new building, conversion or alteration. Ask which existing documents can be relied on and which investigations, specialist advice and approvals are still required.
Understand what counts as usable space
ACECQA’s physical environment guidance describes minimum unencumbered space requirements under regulations 107 and 108: 3.25 square metres indoors and 7 square metres outdoors per child for the service types to which those requirements apply. These are not gross floor-area or total-site-area figures.
Excluded areas and conditions matter. Bathrooms, passageways and certain support areas are excluded from indoor calculations; unsuitable outdoor areas cannot be counted. Do not count the same verandah area towards both indoor and outdoor space. Confirm the applicable calculations and any required approval with the relevant practitioners and regulator, rather than deriving a promised capacity from the property’s advertised size.
Review facilities and daily operation together
Toilet and hygiene facilities are addressed by regulation 109; regulation 112 addresses nappy change facilities for relevant centre-based services. Regulation 110 concerns ventilation, natural light and temperature. Keep these requirements distinct when preparing the brief.
Discuss how the proposed layout supports supervision, movement, hygiene and the needs of the children who will attend. Review emergency arrangements against the actual site and building. Victoria’s premises guidance for long day care and kindergarten provides further context, including the particular challenges of multi-storey premises. Avoid assuming that a generic evacuation note resolves the project’s risks.
Bring a clear brief to the design team
Gather the address, available plans, proposed service type, age groups, operating intentions and known site constraints. Record the documents already held and the questions that remain open. Keep an initial capacity target separate from any number ultimately permitted through the relevant assessment and approval processes.
Explore Vaastu Designers’ childcare centre design service for design and planning documentation support. To discuss your property and project brief, contact Vaastu Designers with the information available.
Planning a proposal on your own Melbourne site? Read our childcare planning permit guidance before progressing the design. Requirements depend on the property and proposed work.